Services · Full Builds

A Full Game From Scratch

One order, one accountable dev or team, one finished game. This service commissions a complete Roblox game, design, systems, world, interface and monetization, scoped in writing before work starts and paid through escrow against milestones you can actually play.

BLOXWORK, the most trusted Roblox developer marketplace in the world.

Escrow on every order

Your money stays held until you approve the finished work. Only then does the dev get paid.

How escrow works
Devs verified with real ID

Every dev shows ID to earn the Verified badge. The document stays private. Only the badge is public.

About the badge
One fair fee

10% of the job, never more than $1,000. No buyer fees. Nothing stacked on top.

The fee rule

What this job involves

Everything, sequenced properly. It starts with a design pass: genre, core loop, system list, content volume, monetization shape, written down and agreed before building begins. Then the foundation systems (saving, currency, data), the playable core loop, the world and content that fill it, the UI layer, and finally polish: testing across devices, performance passes, launch configuration. Each phase produces something you can open and play, which is the only honest way to build a game at a distance.

Who does it varies: a senior solo dev for a focused tycoon or simulator, a small team for anything content heavy. What does not vary is accountability, one counterparty owns the whole outcome, so the economy bug is not "the scripter’s problem" and the ugly menu is not "the builder’s problem." For a first time game owner, that single point of responsibility is worth more than any individual discount.

What a good delivery looks like

A game you can publish: a new player can join, understand the loop in a minute, progress, spend, and return to saved progress, on a phone, without errors, at a frame rate that holds in a full server. Alongside it, the handover pack: the design document as built, the economy and tuning tables in editable form, asset and pass ownership in your account, and a stated post launch fix window for defects in the delivered scope.

Milestones are how you watch it happen without hovering: design approved, core loop playable, content complete, launch candidate. Each one is a play session with a checklist, and the scope names them before the order starts. A dev who resists playable milestones is telling you how the project ends; a dev who proposes them is telling you they have shipped before.

Plan for launch day inside the scope, not after it. Real players do things no test session imagined: they find the economy’s loose thread in an hour, they join on hardware you never tested, they name the bug after you in the comments. A fix window measured in days, with the dev expecting to be on call for the first wave of reports, is what separates a launch from a hope. Put the window’s length and what counts as a defect, versus a new feature wearing a defect’s coat, in writing while everyone is still friends.

What a full game costs in the open market

Devs and teams here set their own prices. The open market’s shape, from Upwork’s published project ranges: a simple game or obby around $500, $2,100, a simulator or tycoon around $1,200, $5,600, a multiplayer RPG around $2,300, $12,300, with original content heavy titles running higher. Quotes far below those bands are templates in a trench coat, a reskinned kit with your title on it, which players identify immediately and the algorithm forgets just as fast.

On a build this size the platform fee stops being a footnote. A 20% cut on a $12,300 game is $2,460; BLOXWORK’s fee is 10% capped at $1,000, $1,000 flat on that build, and the same $1,000 on a $25,000 one. The difference is a content update, a marketing push, or a month of a community manager, kept inside your project instead of skimmed off it.

Why escrow fits a full build

This is the largest cheque most clients in this market ever write to a stranger, and historically it has been written on Discord promises. The failure stories are identical: instalments sent, progress always two weeks away, then silence, with no written scope to point at and no mechanism to recover a cent. Everything about BLOXWORK exists to make that story structurally impossible.

The scope is written and itemised before payment. The money is held by the platform, not handed over on hope. Approval, yours, after playing the milestones, is the only release. The counterparty is ID verified with a public Trust Score riding on the outcome. A full build will always carry creative risk; it should never carry payment risk, and here it does not.

Where BLOXWORK stands today

BLOXWORK opened recently, so its first full game teams are still setting up their profiles. The earliest full builds commissioned here will be the platform’s showcase projects, and the teams know it, which is leverage no late client will ever have.

How hiring works here

1
Agree the scope & pay into escrow

The scope is in writing before you pay. BLOXWORK holds your money. It does not go to the dev yet.

2
The dev builds

Work runs against the agreed scope and delivery time. Revisions in the package are tracked on the order.

3
You approve, money releases

Check the work. Only your approval releases the pay, minus the 10% fee capped at $1,000.

The fee, in plain words

BLOXWORK takes one fee: 10% of the order, and never more than $1,000 on any job, however big the job gets. A $100 job pays a $10 fee and the developer receives $90. A $10,000 job pays $1,000. A $25,000 job still pays $1,000, and the developer receives $24,000. Buyers pay nothing on top of the price they see. The full fee rule.

Are you a full game developer?

Keep 90% of every job. The fee never takes more than $1,000, even on a $25,000 job where a 20% platform takes $5,000. Your pay sits in escrow before you start and lands in USD when the client approves. Show your ID once, wear the Verified badge, and let clients trust you on sight.

Questions, answered

How do payments and milestones line up?

The order is paid into escrow up front and held by BLOXWORK. The scope names the milestone sequence and what you will be able to play at each stage; final approval releases the payment. If a project truly needs staged releases, agree that structure inside the order before it starts, never informally in chat.

How long will my game take?

A focused tycoon or simulator: typically weeks to a few months with an experienced dev. A content heavy RPG: several months. Your quote should include a milestone timeline, and the timeline should have slack in it, every honest dev has been surprised by a build, and the ones who promise the fastest date are usually describing a different, smaller game.

I only have an idea, not a design. Can I still order?

Yes, make the design document milestone one. Many full game devs start exactly there: a paid design phase that produces the spec, which you approve before the build phases proceed. It is the cheapest possible place to discover that an idea needs changing.

Who owns the game, the passes and the assets?

You do. Gamepasses and products are created in your account, the place is delivered into your ownership, and the scope states that work made under the order is yours on release of payment. The Developer Agreement’s originality requirement backs the asset side; your scope makes it explicit for your project.

What happens after launch if something breaks?

Defects in the delivered scope are what the post launch fix window in your scope is for, insist it is named, with a duration. Beyond that window, fixes and updates are new orders, and the dev who built the game is usually the right hire for them, now with a working relationship and a review history between you.

Keep going

Ready when you are

Browse the marketplace with escrow on every order, or put your own work in front of the clients arriving here.